last updated- 20/01/25

 

BRC lead times are calculated from the time a clean order is received (for standard product), or from the time the sign-off drawings are signed and returned to BRC (for special product).

*Lead time for Mesa series products may fluctuate based on inventory.

To obtain current lead times for orders over $120,000 NET, please email: customerservice@brc.group

Graded in Fabric: Orders that contain fabrics that are not included in our standard fabrics will have a lead time of 6-8 weeks (Non carded BRC fabrics are considered COM and must be approved).

Power components are still delayed, with lead times varying from 6-8 weeks depending on the component. For orders containing a power component, please reach out to customerservice@brc.group to obtain a more specific lead time.

Laminate colors which are currently affected by Hurricane Helene:
Field Elm and Fusion Maple
This affects both LPL and HPL
Lead time this material will be 14+ weeks

Please contact Customer Service to check stock and availability.

 

Accessories
series hardware
accessories 4 weeks

 

Casegoods
series hardware std LPL std HPL non-standard
standard  6 weeks*
*Orders less than $60K (Orders above $60K, based on material availability)
8 weeks 10-12 weeks
custom/specials 8 weeks 10 weeks 10-12 weeks
tables 8 weeks 8 weeks 10-12 weeks

 

 

Height Adjustable
series black hardware white hardware silver hardware std LPL std HPL non-standard
Mesa base only 2 leg
Sit Stand*
2 weeks 2 weeks 2 weeks
Mesa base only 3 leg
Sit Stand*
2 weeks 2 weeks 2 weeks
Mesa Table 2 leg
Sit Stand
4 weeks 6 weeks 10-12 weeks
Mesa Table 3 leg
Sit Stand
6 weeks 6 weeks 10-12 weeks
Mesa base only 2 leg
Bifma*
2 weeks 2 weeks 2 weeks
Mesa base only 3 leg
Bifma*
2 weeks 2 weeks 2 weeks
Mesa Table 2 leg
Bifma
4 weeks 6 weeks 10-12 weeks
Mesa Table 3 leg
Bifma
6 weeks 6 weeks 10-12 weeks
Mesa Wall Mount 8 weeks 10 weeks 10-12 weeks
Viva, SoHo, NoLita series 8-10 weeks 8-10 weeks 10-12 weeks